WIP Limits: Finish More by Starting Less

When work slows down, starting another task can feel productive. Often it adds another unfinished item to the same overloaded system. Work-in-progress limits make this visible and encourage finishing before taking on more.

A number and a policy are different things

Work in progress, or WIP, is the number of items started but not finished. A WIP limit is a policy that caps active work in a defined part of the workflow. Counting active items does not mean a team has a limit.

The Kanban Guide for Scrum Teams explicitly distinguishes the WIP metric from policies used to limit WIP. It also describes workflow visualisation and active management of unfinished work. A board without shared policies is useful visibility, but it is not the whole practice.

An illustrative engineering example

Imagine a team whose development lane looks busy while its review lane keeps growing. Starting more coding does not solve the review bottleneck. A review WIP limit can prompt developers to help review, clarify acceptance criteria or unblock a waiting dependency instead.

A limit is not a personal quota or a rule against collaboration. The purpose is to improve flow through the system. The team decides what counts as started and finished, how blocked items are handled and how exceptions are discussed.

This example is illustrative. A real team should choose a limit from its workflow and inspect its effects rather than copy an arbitrary number.

Make the hidden wait visible

An item can be unfinished even when nobody is actively typing. Waiting for review, a decision or an external service still matters. Work item age—how long a started, unfinished item has been open—helps teams notice work that a simple completion count misses.

A limit that excludes all blocked work can hide overload. A limit that is enforced without judgement can also prevent a sensible response to an urgent incident. Make exceptions visible and review why they happened.

Practise with your MyCardy board

Use Planned for possible work and This Week for current commitments. Ask whether the active set is realistic given your time, energy and recovery. Finish, reschedule or intentionally stop something before automatically adding more.

MyCardy does not enforce a numerical WIP limit. Its lanes are a personal planning aid, and “This Week” may include scheduled work you have not started. Do not mistake a lane count for a precise professional WIP metric.

The transferable habit is noticing unfinished commitments and choosing capacity deliberately. That is different from treating every workout as a queue that must be cleared.

A useful review question

Instead of asking only “Why did we finish less?”, ask “Where did work wait, and what could we change about that wait?” In technology teams, that question can lead to smaller changes, clearer policies or shared reviewing.

Continue with small batches and flow metrics.